Release
Date |
RFP
Title
(Download or Link as indicated) |
Mandatory
Pre-Bid? |
Pre-
Bid
Date |
University
Contact |
Quote
Due
Date |
|
|
| 8-28-2008 |
WSU
Projects
Miscellaneous
Trades / Miscellaneous Campus Locations - 2008
Registration
Form
Complete
RFP Information to be downloaded
|
Yes |
9-04-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
9-11-2008 |
|
|
| 8-11-2008 |
WSU
Project M-05097
5425
Woodward Mechanical Service Upgrade - 2008 - (RE-BID
8-11-08)
Registration
Form
Complete
RFP Information to be downloaded
(RE-BID 8-11-08)
Drawings
and Detailed Specifications
Clarification
Dated 8-14-2008
Table
of Contents 8-14-2008
Sign-in
Sheet #1
Minutes
from 8-18-2008
Clarification
2 dated 8-22-2008
Addendum
1 Dated 8-25-2008
Addendum
1 Drawings (8-25-2008)
Drawings
Missing from original Specs (EC 7 and 8)
Clarification
3 dated 8-27-2008 |
Yes |
8-18-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
8-28-2008
Revised
9-02-2008 |
|
|
| 7-22-2008 |
WSU
Project # 05052 & 05060
Boiler
Plant Implementation - Bid Package #8 - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Complete
RFP Information to be downloaded (Revised
and complete 7-25-2008)
Addendum
1 dated 7-28-2008
Sign-in
Sheet #1
Minutes
from 7-31-2008
Addendum
2 dated 8-13-2008
Bid
Tabulation from 8-15-2008 |
Yes |
7-30-2008 |
Loretta McClary
(313) 577-3731 |
8-15-2008 |
|
|
| 7-15-2008 |
WSU
Project 3511-148101
Freer
House Cooling Tower Replacement - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 7-24-2008
Specifications
Reference
Clarification
1 dated 8-01-2008
Clarification
2 dated 8-05-2008
Bid
Tabulation from 8-06-2008 |
Yes |
7-24-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
8-06-2008 |
|
|
| 7-15-2008 |
WSU
Project 048-148168
Cohn
Roof Replacement - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 7-23-2008
Clarification
1 dated 7-24-2008
Clarification
2 dated 7-30-2008
Bid
Tabulation from 7-31-2008 |
Yes |
7-23-2008 |
Valerie Kreher
(313) 577-3720 |
7-31-2008 |
|
|
| 7-16-2008 |
WSU
Project 080-151789
Baseball
Dugout Replacement Project - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
(Original)
Addendum
1 dated 7-16-2008
(Contains Prevailing Wage Rate)
Addendum
2 dated 7-18-2008
Drawings
and Detailed Specifications (Revised 7/18/08)
Sign-in
Sheet #1 & 2
Addendum
3 dated 7-21-2008
Addendum
3 Drawings and Detailed Specifications dated 7/21/2008
Minutes
from 7-18-2008
Addendum
4 dated 7-24-2008
Bid
Tabulation from 7-25-2008 |
Yes |
7-18-2008 |
Paula Reyes
(313) 577-3649 |
7-25-2008 |
|
|
| 6-25-2008 |
WSU
Project 060-123119
University
Services HVAC Renovation Project - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 7-02-2008
Trane
Equipment and Specifications
Pre-Purchased
Equipment
Clarification
1 dated 7-09-08
Bid
Tabulation from 7-16-2008 |
Yes |
7-02-2008 |
Paula Reyes
(313) 577-3649 |
7-16-2008 |
|
|
| 6-16-2008 |
WSU
Project 062-87282
AAB
Chilled Water Piping Replacement - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Minutes
from 6-23-2008
Sign-in
Sheet #1 & 2
Drawings
for Addendum 1 dated 6-27-2008
Addendum
1 dated 6-30-2008 (Drawings
Above)
Clarification
1 dated 7-01-2008
Bid
Tabulation from 7-02-2008 |
Yes |
6-23-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
7-02-2008 |
|
|
| 6-16-2008 |
WSU
Project M-05097
5425
Woodward Mechanical Service Upgrade - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1 & 2
Technical
Specifications
Minutes
from 6-24-2008
Drawings
for Addendum 1 dated 6-30-2008
Addendum
1 dated 7-09-2008 (Corrected
Version) - (Drawings Above)
Clarification
One dated 7-08-08
Bid
Tabulation from 7-16-2008 |
Yes |
6-24-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
7-02-2008
Revised
7-16-2008 |
|
|
| 6-12-2008 |
WSU
Project 048-122318
Cohn
Building - Elevator Renovation - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1, 2 & 3
Minutes
from 6-18-2008
Clarification
One dated 6-26-2008
Addendum
1 dated 7-01-2008 (Cover letter)
Addendum
1A dated 6-30-2008
Clarification
Two dated 7-09-2008
Addendum
2 dated 7-09-2008
Addendum
2A Drawings dated 7-09-2008
Bid
Tabulation from 7-15-2008 |
Yes |
6-18-2008 |
Loretta McClary
(313) 577-3731 |
7-10-2008
Revised
7-15-2008 |
|
|
| 6-09-2008 |
WSU
Project M-1176-J
5425
Woodward Electric Service Upgrade - 2008 WSU_M-1176-J_5425_Woodward_Electrical_Service_Upgrade_Clarification_1.doc
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1 & 2
Minutes
from 6-16-2008
Clarification
One dated 6-23-2008 (Due Date postponed)
Addendum 1
dated 6-24-2008 (See Below)
Drawings
for Addendum 1 dated 6-24-2008
Clarification
Two dated 6-24-2008
Addendum
1 dated 6-26-2008 (Identical to Clarification
1)
Bid
Tabulation from 6-24-2008 |
Yes |
6-16-2008 |
Kimberly
Tomaszewski
(313) 577-3757 |
6-24-2008
Revised
6-26-2008 |
|
|
| 5-28-2008 |
WSU
Project 033-138431
Parking
Lot 33 Renovation - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Drawings
and Detailed Specifications
(Revised to Larger Size)
Sign-in
Sheet #1
Minutes
from 6-05-2008 (Corrected Version)
Addendum
1 dated 6-05-2008 (Corrected Version)
Clarification
One dated 6-12-2008
Bid
Tabulation from 6-10-2008
Contract
has been issued to Nagle Paving Company |
Yes |
6-05-2008 |
Loretta McClary
(313) 577-3731 |
6-19-2008 |
|
|
| 5-19-2008 |
WSU
Project 039-139031
Community
Arts Replacement of Doors - 2008
Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 5-27-2008
Addendum
1 dated 5-27-2008
Clarification
One dated 6-04-2008
Bid
Tabulation from 6-10-2008
Contract
has been issued to Envision Builders, Inc |
Yes |
5-27-2008 |
Loretta McClary
(313) 577-3731 |
6-02-2008 |
|
|
| 3-20-2008 |
WSU
Project 612-125186
Scott
Hall Room 1331 Renovations for C&IT Equipment - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheets #1 & 2
Minutes
from 3-27-2008
Bid
Tabulation from 3-19-2008
Contract
has been issued to Chezcore, Inc. |
Yes |
3-27-2008 |
Christina Radcliffe
(313) 577-3708 |
4-03-2008 |
|
|
| 2-27-2008 |
WSU
Project 069-771166
Helen
DeRoy Apartments Renovations / Campus Health Center Expansion - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheets #1, 2, 3, & 4
Minutes
from 3-07-2008
Addendum
1 dated 3-14-2008
Bid
Tabulation from 3-19-2008
Contract
has been issued to Envision Builders, Inc |
Yes |
3-05-2008
Revised
-
3-07-2008
at 10:00 am - Same Location |
Paula Reyes
(313) 577-3649 |
3-19-2008 |
|
|
| 2-21-2008 |
WSU
Project 155 - 143536
5th
Floor Manoogian Building Renovations - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Asbestos
Report
Lead
Paint Report
Cut
sheet and Installation Instructions for OneCard readers
Sign-in
Sheets #1, 2, & 3
Minutes
from 2-28-2008
Clarification
1 dated 3-06-2008
Clarification
2 dated 3-06-2008
Addendum
1 and related Drawings
Bid
Tabulation from 3-18-2008 |
Yes |
2-28-2008 |
Robert Kuhn
(313) 577-3712 |
3-10-2008 |
|
|
| 2-06-2008 |
WSU
Project 40-128742
Art
Building Security Card Access - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheets #1
Minutes
from 2-13-2008
Addendum
One dated 2-18-2008
Addendum
One DRAWINGS dated 2-18-2008
Clarification
One dated 2-21-2008
Bid
Tabulation from 2-27-2008 |
Yes |
2-13-2008 |
Loretta McClary
(313) 577-3731 |
2-20-2008
Revised
2-27-2008 |
|
|
| 1-24-2008 |
WSU
Project 090-147353
Painting
for AAB and FAB Buildings - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheets #1 & 2
Minutes
from 1-28-2008
Clarification
One dated 1-29-2008
Clarification
Two dated 1-31-2008
Bid
Tabulation from 2-06-2008
Contract
has been issued to Detroit Spectrum Painters, Inc |
Yes |
1-28-2008 |
Robert Kuhn
(313) 577-3712 |
2-06-2008 |
|
|
| 1-24-2008 |
WSU
Project 090-147353
Carpet
for AAB and FAB Buildings - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheets #1 & 2
Minutes
from 1-28-2008
Clarification
One dated 1-29-2008
Clarification
Two dated 1-31-2008
Bid
Tabulation from 2-06-2008
Contracts
have been issued to Contract Design Group |
Yes |
1-28-2008 |
Robert Kuhn
(313) 577-3712 |
2-06-2008 |
|
|
| 1-11-2008 |
WSU
Project 090-147353
WSU
Engineering Building - Boiler Installation - 2008
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded (328 pages)
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 1-17-2008
Addendum
One (complete) dated 1-25-2008
Bid
Tabulation from 1-31-2008
Contracts
have been issued to Pipe Systems Inc |
Yes |
1-17-2008 |
Valerie Kreher
(313) 577-3720 |
1-31-2008 |
|
|
| 1-08-2008 |
WSU
Project 612-128744
School
of Medicine Deans Suite Renovations - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
State
of Michigan Application for Fire Safety Plan Examination
Sign-in
Sheet #1
Minutes
from 1-16-2008
Addendum
One dated 1-18-2008
Clarification
One dated 1-18-2008
Addendum
Two dated 1-22-2008
Clarification
Two dated 1-23-2008
Clarification
Three dated 1-24-2008
Bid
Tabulation from 1-25-2008
Contract
has been issued to Envision Builders, Inc |
Yes |
1-16-2008 |
Valerie Kreher
(313) 577-3720 |
1-25-2008 |
|
|
| 12-06-2007 |
WSU
Project 509-141542
Design
Build Services for the Merrill Palmer/ Skillman/ Knapp Security Upgrades
Project - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Addendum
One dated 12-08-2007 (before the pre-bid meeting)
Sign-in
Sheet #1 & 2
Minutes
from 12-14-2007
Bid
Tabulation from 1-02-2008 |
Yes |
12-14-2007 |
Kimberly
Tomaszewski
(313) 577-3757 |
1-02-2008 |
|
|
| 12-06-2007 |
WSU
Project 002-141537
Design
Build Services for the WSU Campus Signage Removal of Flying W’s - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Campus
map with sign symbols, 11-29-07.pdf
Addendum
One dated 12-08-2007 (before the pre-bid meeting)
Sign-in
Sheet #1
Minutes
from 12-12-2007
Bid
Tabulation from 12-18-2007
Contract
has been issued to Cal Sign Company |
Yes |
12-12-2007 |
Kimberly
Tomaszewski
(313) 577-3757 |
12-18-2007 |
|
|
| 12-04-2007 |
WSU
Project 016-138865
State
Hall 4th Floor Unisex Restroom ADA Renovation - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Sign-in
Sheet #1
Minutes
from 12-11-2007
Addendum
One dated 12-13-2007
Clarification
One dated 12-17-2007
Bid
Tabulation from 12-18-2007
Contract
has been issued to Steve Ostrowitz Builders |
Yes |
12-11-2007 |
Valerie Kreher
(313) 577-3720 |
12-18-2007 |
|
|
| 11-14-2007 |
WSU
Project 603-145105
Pharmacy
and Health Sciences Stair Renovations - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Clarification
One dated 11-21-2007
Sign-in
Sheet #1 & 2
Minutes
from 11-19-2007
Clarification
Two dated 12-06-2007
Contract
has been issued to Robert Van Kampen Co. |
Yes |
11-26-2007
Revised
11-29-2007 |
Kimberly
Tomaszewski
(313) 577-3757 |
12-05-2007
Revised
12-07-2007 |
|
|
| 11-07-2007 |
WSU
Project 07-10-2
Wayne
State University- Research and Technology Park (WSU-RTP)
Tech
Town Fourth Floor Buildout-2007:
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Addendum
One dated 11-12-2007 (before the pre-bid meeting)
Sign-in
Sheets # 1, 2 & 3
Minutes
from 11-13-2007
Addendum
Two dated 11-14-2007
Bid
Tabulation from 11-19-2007
To
be Contracted by Tech Town |
Yes |
11-13-2007 |
Valerie Kreher
(313) 577-3720 |
11-19-2007 |
|
|
| 10-10-2007 |
WSU
Project 07-10-1
Wayne
State University- Research and Technology Park (WSU-RTP)
Tech
Town First Floor Buildout-2007:
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Addendum
One dated 10-16-2007 (before the pre-bid meeting)
Addendum
Two dated 10-17-2007
Sign-in
Sheets # 1, 2 & 3
Reference
Drawings and Detailed Specifications
(for information purpose only).
Minutes
from 10-17-2007
Clarification
One dated 10-21-2007
Clarification
Two (One) dated 10-24-2007
Addendum
Three dated 10-24-2007
Bid
Tabulation from 10-26-2007
To
be Contracted by Tech Town |
Yes |
10-17-2007 |
Valerie Kreher
(313) 577-3720 |
10-29-2007
Revised
10-25-2007
Revised
10-26-2007 |
|
|
| 9-26-2007 |
WSU
Project 069-771166
Campus
Health Center Expansion - 2007
Order
Rebid 2-27-2008
|
Yes |
10-02-2007 |
Paula Reyes
(313) 577-3649 |
10-18-2007 |
|
|
| 9-28-2007 |
WSU
Project 0048-135550
Cohn
Building Renovations Room 15 Renovation to Multimedia Applications - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Tables
& Seating Drawings and Specs (for informational
purposes only)
Sign-in
Sheets # 1, 2, 3 & 4
Minutes
from 10-03-2007
Addendum
One dated 10-04-2007
Addendum
Two dated 10-05-2007
Clarification
One dated 10-09-2007
Clarification
Two dated 10-10-2007
Bid
Tabulation from 10-15-2007
Contract
has been issued to Construction Specialties, Inc |
Yes |
10-03-2007 |
Valerie Kreher
(313) 577-3720 |
10-15-2007 |
|
|
| 9-19-2007 |
WSU
Project 016-138878 & 016-138873
State
Hall Restroom Renovations and Energy Conservation - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
and Detailed Specifications
Minutes
from 9-27-2007
Sign-in
Sheets # 1, 2, & 3
Clarification
One dated 9-28-2007
Bid
Tabulation from 9-20-2007
Contracts
have been issued to J.R. Fiore |
Yes |
9-27-2007 |
Robert Kuhn
(313) 577-3712 |
10-04-2007 |
|
|
| 9-06-2007 |
WSU
Project 507-138744
University
Tower Corridor Carpet Replacement
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed
Specifications and Drawings
Minutes
from 9-13-2007
Addendum
One dated 9-17-2007
Sign-in
Sheets # 1, & 2
Clarification
One dated 9-18-2007
Bid
Tabulation from 9-20-2007
Contract
has been issued to Contract Design Group |
Yes |
9-13-2007 |
Christina Radcliffe
(313) 577-3708 |
9-20-2007 |
|
|
| 9-06-2007 |
WSU
Project 134-137350
DeRoy
Apartment Kitchen Cabinet Replacement
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Drawings
Minutes
from 9-13-2007
Sign-in
Sheets # 1, & 2
Addendum
One dated 9-13-2007
Bid
Tabulation from 9-24-2007
Contract
has been issued to D&B Burns Construction |
Yes |
9-13-2007 |
Christina Radcliffe
(313) 577-3708 |
9-21-2007
Revised
9-24-2007 |
|
|
| 8-16-2007 |
WSU
Project 080-128274
Matthaei
Academic Resource Center - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed
Specifications and Drawings
Prevailing
Wage Schedule (8-21-2007)
Minutes
from 8-21-2007
Sign-in
Sheets # 1, 2, 3, &4
Bid
Tabulation from 8-30-2007
Contract
has been issued to Caasti Contracting Services |
Yes |
8-21-2007 |
Valerie Kreher
(313) 577-3720 |
8-30-2007 |
|
|
| 8-20-2007 |
WSU
Project 016-0138879
State
Hall Corridor Painting - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed
Specifications and Drawings
Sign-in
Sheets # 1, 2, & 3
Clarification
One dated 8-29-2007
Clarification
Two dated 8-29-2007
Minutes
from 8-27-2007
Clarification
Three dated 8-30-2007
Bid
Tabulation from 9-06-2007
Contract
has been issued to Hermes Painting |
Yes |
8-27-2007 |
Robert Kuhn
(313) 577-3712 |
9-05-2007 |
|
|
| 8-20-2007 |
WSU
Project 016-0138885
Design
Build Services for the State Hall Lighting and Motion Sensor Project -
2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Cut
Sheets on Various Products
Sign-in
Sheets # 1 & 2
Minutes
from 8-27-2007
Clarification
One dated 8-29-2007
Clarification
Two dated 8-30-2007
Bid
Tabulation from 9-05-2007
Contract
has been issued to McNulty Electrical Inc. |
Yes |
8-27-2007 |
Robert Kuhn
(313) 577-3712 |
9-05-2007 |
|
|
| 8-16-2007 |
WSU
Project 606-03023
Shiffman
Library Hazardous Materials Abatement - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Project
Drawings
Asbestos
Survey Report
Special
Note regarding additional information
Sign-in
Sheets # 1, 2, & 3
Minutes
from 8-22-2007
Clarification
One dated 8-28-2007
Bid
Tabulation from 8-29-2007
Contract
has been issued to Environmental Maintenance Engineers |
Yes |
8-22-2007 |
Kimberly
Tomaszewski
(313) 577-3757 |
8-29-2007 |
|
|
| 8-16-2007 |
WSU
Project 611-119586
Lande
Elevator Renovation - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed
Specifications and Drawings
Minutes
from 8-23-2007
Sign-in
Sheets # 1, & 2
Bid
Tabulation from 9-13-2007 |
Yes |
8-23-2007 |
Loretta McClary
(313) 577-3731 |
9-13-2007 |
|
|
| 7-30-2007 |
WSU
Project 155-138877 & 155-138867
Manoogian
Hall Restroom Renovations and Energy Conservation - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed
Specifications and Drawings. (11
x 17)
Sign-in
Sheets # 1, & 2
Minutes
from 8-06-2007 Revised 8-08-2007 at
4:30 p.m.
Clarification
One dated 8-08-2007
Drawings
for Location of Electrical Panels
Clarification
Two dated 8-13-2007
Bid
Tabulation from 8-17-2007
Contract
has been issued to Caasti Contracting Services |
Yes |
8-06-2007 |
Robert Kuhn
(313) 577-3712 |
8-17-2007 |
|
|
| 7-30-2007 |
WSU
Project 155-138871
Manoogian
Hall Corridor Lighting and Classroom Motion Sensors - 2007
Advertisement
Information download ....Registration
Form
Complete
RFP Information to be downloaded
Detailed Specifications
and Drawings (Included in the RFP)
Sign-in
Sheets # 1, & 2
Minutes
from 8-06-2007
Bid
Tabulation from 8-17-2007
Contract
has been issued to Industrial Electric |
Yes |
8-06-2007 |
Robert Kuhn
(313) 577-3712 |
8-17-2007 |
|
|
| 7-25-2007 |
WSU
Project 525-133277
Oakland
Center Signage Replacement Project - 2007
Advertisement
Information download ....Registration
Form
Comp |